The production process of seamless steel tubes can be divided into cold drawing and hot rolling

- Jan 17, 2019-

The production process of general seamless steel pipe can be divided into cold drawing and hot rolling. The production process of cold rolled seamless steel pipe is generally more complicated than hot rolling. The pipe blank must first be rolled in three rolls. Sizing test, if the surface does not respond to the crack, the round tube is cut by a cutter and cut into a blank of about one meter in length. Then enter the annealing process, the acidification should be acid-washed with acid liquid. When pickling, pay attention to whether there is a large amount of foaming on the surface. If there is a large amount of foaming, the quality of the steel pipe will not reach the corresponding standard. The appearance of cold-rolled seamless steel pipe is shorter than that of hot-rolled seamless steel pipe. The wall thickness of cold-rolled seamless steel pipe is generally smaller than that of hot-rolled seamless steel pipe, but the surface looks brighter than thick-walled seamless steel pipe, and the surface is not too It's rough and there aren't too many burrs in the caliber.

The delivery status of the hot-rolled seamless steel pipe is generally delivered after the heat treatment in the hot rolled state. After the quality inspection, the hot-rolled seamless steel pipe is subjected to strict manual selection by the staff. After the quality inspection, the surface is oiled, followed by multiple cold drawing experiments, and the perforation experiment is performed after the hot rolling treatment. If the perforation is too large, straightening correction is required. After straightening, it is sent to the flaw detector by the conveyor to perform the flaw detection experiment. Finally, the label is placed, the specifications are arranged, and then placed in the warehouse.